What Happens Before a Foundation Is Designed? A Simple Look at Geotechnical Investigations
Before any foundation is designed, engineers must understand exactly what is happening underground. A geotechnical investigation studies soil, rock, and ...
North Avenue Bridge: Instrumentation, Monitoring, and Integrity Testing in a Live Urban Rail Environment
North Avenue Bridge replaces historic arches with a modern bridge to meet rising rail demand—with support from FTG ...
Harry Nice Bridge Geotechnical Instrumentation Case Study
Foundation Test Group, Inc. is particularly excited that Senior Geotechnical Engineer Kevin Tehansky, P.E. will be presenting, ”Harry Nice Bridge ...
Baltimore Arena Geotechnical Redevelopment and Design
Baltimore Arena Geotechnical Redevelopment and Design As part of Baltimore City's effort to develop a new era of entertainment in ...
Route 7 Corridor Improvements
How do you test in-place concrete? The most common concrete inspection activities include testing the properties of fresh (wet) concrete ...
Drilled Shaft Installation for College of Health Building – Towson University, MD
Drilled shaft installation continues for the foundation of the new College of Health building at Towson University. Foundation Test Group, ...
Target Value Design Versus Risk Reward
Lean and sustainable construction is vital in today's market. Within our team's approach to all projects, inherent risk is measured ...
Pile Driving Project in Southern Maryland
Hovering through the Atlantic Coastal Plain region, FTG's drone services captured timber pile driving operations for a project in Southern ...
Bearing Capacity Testing, CSX Coal Pier – Baltimore, MD
Foundation Test Group, Inc. performed testing for bearing capacity of the soil that will be beneath a crane moving equipment ...

