Integrated Monitoring for Historic Tunnel Rehabilitation: From Baseline to Construction
Integrated monitoring supported the rehabilitation of Baltimore’s Howard Street Tunnel through phased baseline and construction instrumentation ...
North Avenue Bridge: Instrumentation, Monitoring, and Integrity Testing in a Live Urban Rail Environment
North Avenue Bridge replaces historic arches with a modern bridge to meet rising rail demand—with support from FTG ...
Advanced Pavement Analysis: Utilizing Nested Piezometers for Damage Detection
FTG monitors pavement heave & water ponding with piezometers and RMPs. Data-driven analysis & early warning ...
Harry Nice Bridge Geotechnical Instrumentation Case Study
Foundation Test Group, Inc. is particularly excited that Senior Geotechnical Engineer Kevin Tehansky, P.E. will be presenting, ”Harry Nice Bridge ...
Harry Nice Bridge – Construction Phase Upstate in Newburg, MD and Dahlgren, VA
Since the start of construction phase in late summer of 2020, bridge development has progressed with successful completion of multiple ...
Site Characterization: Low Investment, High Payoff
Site characterization is a systematic study conducted to collect data regarding in-situ ground conditions. The main purpose of a site ...
CSL Testing Continues – CSX Bridge, Columbus, OH
The snow can't stop Foundation Test Group as Cross Hole Sonic Logging testing continues on a new CSX Bridge over ...
Drilled Shaft Installation – Morgan State University
Drilled shaft installation is underway for Morgan State University's new Thurgood Marshall Hall! FTG has teamed with Atlantic Caisson and ...
Parkside Pedestrian Bridge – Washington, D.C.
Construction is underway on a pedestrian bridge that will provide access between multiple neighborhoods and a local Metro Station in ...

