CLIENT
PKF-Mark III, Inc.
LOCATION
Liberty State Park, Jersey City, NJ
THE CHALLENGE
Verifying Foundation Integrity for Critical Waterfront Infrastructure
The new Liberty State Park Ferry & Emergency Evacuation Terminal will replace aging ferry infrastructure with a modern waterfront facility serving more than 4 million annual visitors while enhancing regional emergency response capabilities. FTG provided Crosshole Sonic Logging (CSL) testing to verify the integrity of the drilled shaft foundations supporting this critical infrastructure.
Supporting construction of a new ferry and emergency evacuation terminal required verification of drilled shaft integrity in a demanding marine environment. Because the facility is designed to support both daily ferry operations and emergency evacuation activities, the project team needed reliable foundation testing data to verify structural quality and keep construction moving forward.
Marine Environment: Active waterfront construction conditions.
Critical Infrastructure: Ferry and emergency evacuation facility.
Foundation Integrity: Drilled shaft integrity verification.
Construction Coordination: Multi-phase testing support.
SERVICES / SOLUTIONS
Crosshole Sonic Logging (CSL) Testing & Foundation Verification
FTG conducted Crosshole Sonic Logging (CSL) testing to evaluate the integrity and consistency of drilled shaft foundations supporting the new terminal. Testing was performed throughout multiple phases of construction, providing quality assurance data that helped verify foundation integrity and support ongoing project progress.
Crosshole Sonic Logging (CSL) testing
Drilled shaft integrity verification
Non-destructive foundation testing
Quality assurance reporting
Multi-phase construction testing support
Foundation verification for critical infrastructure
36
drilled shafts tested
6
CSL testing campaigns completed
4M+
Annual visitors supported
$22M
Terminal construction project
RESULTS
Building Confidence Below the Surface
FTG's Crosshole Sonic Logging (CSL) testing provided the quality assurance data needed to verify drilled shaft integrity throughout construction. By delivering timely, accurate foundation testing, our team helped support continued progress on a transportation facility that will serve millions of visitors and strengthen regional emergency preparedness.
Verified drilled shaft integrity through non-destructive testing
Supported foundation quality assurance throughout construction
Delivered timely testing and reporting to keep construction moving forward
Supported construction of critical transportation and emergency evacuation infrastructure