Staff Geologist, Derek Seibel mobilized to support NE Remsco with preconstruction soil borings and rock core drilling for SC-940, located in Baltimore, MD.
FTG is also providing on-call vibration monitoring and instrumentation services during the tunneling operations. Test borings allow Team FTG to examine and identify the native material, with minimal ground disturbances, before tunneling to predict soil and rock interfaces which could affect tunnel alignment or construction progress.


