Riverwalk Tower Drilled Shaft Redesign

Project Players 

Owner: Confidential Client

Contractor: Moretrench

Drilled Shaft Designer: Foundation Test Group

Project Details

Constructed along the east bank of the Schuylkill River in the heart of Philadelphia, the Riverwalk Tower project is a mixed-use multi-story structure consisting of three podium levels emanating from street grade and parking platforms, providing a panoramic view of the city skyline. The site geology, located in a historic coal yard, consisted of a top urban fill layer, underlain by variable alluvial clays, and a transitioning disintegrated rock layer into bedrock at depths of 20 to 50 ft below grade. The original foundation design provided by the owner’s geotechnical report consisted of a drilled shaft option with dimensions of varying telescoping diameters up to 8-ft, more than 60-ft in depth, and rock sockets up to 20-ft long. Due to the weak expected nature of the disintegrated rock stratum in comparison to bedrock, original design parameters estimated allowable end bearing capacities in the range of 45-100 ksf and side shear capacities in the range of 5-10 ksf.    

A load test program was developed with two test shaft locations; one terminated in the weakest of rock conditions and the other terminated into competent bedrock.

For analysis of both end bearing and side shear resistance values of the materials, a sacrificial bi-directional hydraulic jack and load cell was installed within a steel reinforcing frame lowered into the shaft prior to concrete placement to a depth of six inches from the bottom. The jack was able to simultaneously apply a maximum test load of up to 4,750 kips in both upward and downward directions.  

Results of the load testing indicated that allowable design capacities between the weak disintegrated rock and competent bedrock ranged from 867-990 ksf end bearing and 28.5-42.7 ksf side resistance per shaft. Values of up to 10 times original design capacity! The redesign enabled on-site tooling to be minimized to two auger diameter options of 36 and 60 inches with less reinforcing steel and total drilled depths not to exceed 50-ft, rock sockets not to exceed 10-ft. Direct overall project savings brought a value of $1.5 million along with three months shorter schedule duration.  

Need to know more about Deep Foundation Testing?

Kevin E. Tehansky, P.E.Please contact me anytime.
Kevin Tehansky, 410.517.0715
or email ktehansky@foundationtestgroup.com

Other Deep Foundation Engineering Projects

Thermal Integrity Profiling Projects

August 25, 2021

WBE Foundation Test Group (FTG) is a certified Women-Owned (WBE) engineering and testing company networked to support design and construction […]

Malcolm X Bridge

November 9, 2020

Location: Washington, DC Developer: District of Columbia Department of Transportation General Contractor: Fort Myers Construction Corporation Specialty Testing Engineer: Foundation […]

Deep Foundation Remediation Projects

July 21, 2020

WBE Foundation Test Group (FTG) is a certified Women-Owned (WBE) engineering and testing company networked to support design and construction […]

Ashburton Reservoir – Support of Excavation Design

March 6, 2020

Project Team  Owner: City of Baltimore Designer: Hazen | AECOM General Contractor: Oscar Renda Contracting, Inc. SOE Designer: Foundation Test […]

Project Archives

March 6, 2020

Browse our Project archives below. You can search in each of our project categories to find the project you’re most […]

Specialty Testing

February 21, 2020

Developer: District of Columbia Department of Transportation General Contractor: Fort Myers Construction Corporation Specialty Testing Engineer: Foundation Test Group Project […]

MD 273 Bridge Replacement over Big Elk Creek

February 21, 2020

MD 273 Bridge Replacement over Big Elk Creek  Project Players  Developer: Maryland State Highway Administration  Designer: Maryland Department of Transportation  General Contractor: Allan […]

Guilford Reservoir

January 22, 2020

Project Players  Owner: City of Baltimore Designer: PHR&A/Hazen and Sawyer Geotechnical EOR: EBA General Contractor: Allan Myers Drilled Shaft Contractor: […]

Port Covington Chapter 1B Infrastructure Revitalization

January 22, 2020

Project Players  Developer: Weller Development Company Designers: Hope Furrer Associates, MGMA, Delone Hampton, Hord Coplan Macht, Moffatt & Nichol, Torti Gallas and […]

WBE

Foundation Test Group (FTG) is a certified Women-Owned (WBE) engineering and testing company networked to support design and construction projects for a diverse group of Engineers, Architects and Contractors as well as multiple state and local governments. Our firm seeks new relationships with teaming partners to provide state of the art support in a strong, but niche market.

Foundation Test Group., Inc.
info@foundationtestgroup.com
11408 Cronridge Drive, Suite K
Owings Mills, MD 21117
Phone: 410-517-0715
Fax: 410-517-0716