FTG News

Joe Teta Headshot

#TeamFTG Welcomes Joe Teta

We are thrilled to welcome Joe Teta to #TeamFTG! Joe comes to FTG with a background in construction and is excited about developing a more broad vision of our global industry. Welcome Joe! In Other FTG News What Happens Before a Foundation Is Designed? A Simple Look at Geotechnical Investigations April 1, 2026 Inside FTG’s

safety pictures

Quality System Management, the Hallmark of Foundation Test Group

Within construction, quality management is the system used to deliver user safety. It assures that buildings are built to code and that users will be safe inside them. Quality assurance and quality control together build quality systems management. QSM helps inspection processes move smoothly. Without proper oversee and application, a project might not be built

freedom road bridge

Freedom Road Bridge – Butler County, PA

Our team is on site to perform quality assurance testing for drilled shafts in the two abutments for a new bridge located on PennDOT’s ECMS 67185 SR 3020, Freedom Road over Interstate 76 in Butler County, Pennsylvania. FTG is performing both Crosshole Sonic Logging (CSL) and Thermal Integrity Profile (TIP) testing for McCrossin Foundations. Testing

coronavirus temperature

COVID-19 Exposure Prevention and Protocol Plan

Foundation Test Group takes the health and safety of our employees extremely seriously. With the spread of the coronavirus (COVID-19), a respiratory disease caused by the SARS-CoV-2 virus, we remain vigilant in mitigating the outbreak. We are a proud part of the construction industry, which many have deemed “essential” during this declared National Emergency. In

harry nice bridge

Harry Nice Bridge – Construction Phase in Newburg, MD

Geotechnical instrumentation monitoring has entered the Construction Phase at the Harry Nice Bridge project as pre-cast concrete pile driving is underway. A combination of 140+ instruments including seismographs, tilt sensors, strain gauges, and structural monitoring prisms with automated total stations are currently being utilized to monitor existing bridge performance. Visit our Project Archives for more.

MTA – SW204, Baltimore, Maryland

FTG installed two automated extensometers adjacent to Baltimore’s Light Rail tracks for monitoring during tunnel boring operations. Throughout the construction of the new stormwater culvert, extensometers will provide an early warning system for settlement of both the overburden soils and track foundation; thus allowing for real time adjustments to construction methodology toward less impact and

Drilled Shaft Inspections in Atlanta, Georgia

For the SD1975 Bridge Project over Lindbergh Drive in Atlanta, GA, Team FTG provided a range of specialty testing for Drilled Shaft inspection in construction of a new railroad bridge. For Deep Foundation Contractor Clearwater Construction of Mercer, Pennsylvania. From its deep foundation inspection arsenal, FTG utilized two downhole cameras to inspect and confirm the quality

WBE

Foundation Test Group (FTG) is a certified Women-Owned (WBE) engineering and testing company networked to support design and construction projects for a diverse group of Engineers, Architects and Contractors as well as multiple state and local governments. Our firm seeks new relationships with teaming partners to provide state of the art support in a strong, but niche market.

Foundation Test Group., Inc.
info@foundationtestgroup.com
11408 Cronridge Drive, Suite K
Owings Mills, MD 21117
Phone: 410-517-0715 Fax: 410-517-0716