North Avenue Bridge: Instrumentation, Monitoring, and Integrity Testing in a Live Urban Rail Environment
North Avenue Bridge replaces historic arches with a modern bridge to meet rising rail demand—with support from FTG.
North Avenue Bridge replaces historic arches with a modern bridge to meet rising rail demand—with support from FTG.
Baltimore Arena Geotechnical Redevelopment and Design As part of Baltimore City’s effort to develop a new era of entertainment in a renovated Baltimore Arena, otherwise known as Royal Farms Arena, Foundation Test Group, Inc. (FTG) has been pleased to provide the services of Geotechnical Engineering Design and Inspection for the project. Working with both Owner
Baltimore Arena Geotechnical Redevelopment and Design Read More »
How do you test in-place concrete? The most common concrete inspection activities include testing the properties of fresh (wet) concrete and casting cylindrical specimens for strength testing, but these cannot directly verify the integrity of the concrete that makes up your structure. This is particularly problematic when dealing with large or inaccessible projects, such as
Route 7 Corridor Improvements Read More »
Drilled shaft installation continues for the foundation of the new College of Health building at Towson University. Foundation Test Group, Inc. is working with Gilbane and Atlantic Caisson to implement a drilled shaft program that satisfies the structural demands of the building foundations. FTG is on site to verify that the shafts are drilled to
Drilled Shaft Installation for College of Health Building – Towson University, MD Read More »
Foundation Test Group, Inc. has been involved with the engineering, inspection and testing for the many facets of the drilled shaft foundation elements that will support the rebuild of BGE’s two existing single-circuit 115 kV transmission lines crossing Bush River on the Perryman to Edgewood line. The existing lattice structures will be replaced with double-circuit
Rebuild of BGE’s Transmission Lines – Bush River, MD Read More »
Lean and sustainable construction is vital in today’s market. Within our team’s approach to all projects, inherent risk is measured. To best align a streamlined approach for value, collaborative relationships are sought to meet the project delivery method. Within the delivery assignment, opportunity exists to propose risk-reward. Project value and profit are key for all
Target Value Design Versus Risk Reward Read More »
Drilled shaft installation has just begun for the retaining walls for the I-95 Express Lane Expansion. FTG is working with Hillis-Carnes Engineering, General Contractor Allan Myers and foundation contractor Clearwater Construction to implement inspection of the drilled shaft program that satisfies the specified structural demands of retaining wall foundations. FTG is on site to verify
Drilled Shaft Installation – Baltimore County, MD Read More »
Hovering through the Atlantic Coastal Plain region, FTG’s drone services captured timber pile driving operations for a project in Southern Maryland. As the Geotechnical Engineer of Record for the pile foundations, FTG provided installation driving criteria to support anticipated structural loads. Through the soft tidal marsh deposits of the coastal area, timber piles are suitable
Pile Driving Project in Southern Maryland Read More »
SuperPile 2021 held in Philadelphia, PA from June 23rd-25th, 2021 was a great success. In the new world of Zoom and Teams meetings we often underestimate the importance of direct face-to-face meetings. While those platforms provide an important service, they can not recreate the full exchange of ideas that meeting in person does. It is
SuperPile ’21 Successful Three-Day Event – Philadelphia, PA Read More »
Over the Potomac River, floating docks and suspended jacking systems were used to carry out lateral load testing of driven pipe piles for a proposed Public Safety Pier at the nation’s harbor. As an industry leader in deep foundation testing, FTG got the call to develop a load testing program for structural pile design confirmation
Lateral Load Testing at National Harbor Safety Pier – Fort Washington, MD Read More »